Public program language, grouped by phase. Where GridLedge checks a term today, the card says so — without overclaiming.

← Back to home

18 terms

  • Carryover allocation

    CarryoverGridLedge checks this

    The allocation letter that preserves tax credits for a project that will place in service in a later year, subject to program timing rules.

  • Partnership agreement (LPA)

    CarryoverGridLedge checks this

    The limited partnership agreement that sets ownership, capital, and many of the economic terms the construction file must stay consistent with.

  • 10% test

    Carryover

    A carryover requirement that a minimum percentage of reasonably expected basis be incurred by a stated deadline.

  • G702 draw request

    ConstructionGridLedge checks this

    The AIA application for payment summarizing the contractor's request for a construction draw.

  • G703 continuation sheet

    ConstructionGridLedge checks this

    The schedule of values that itemizes work completed and stored materials behind a G702.

  • Change order

    ConstructionGridLedge checks this

    A documented change to scope, cost, or schedule that must stay reconciled to draws and the eventual cost certification basis.

  • Design & Construction Features (DCF)

    ConstructionGridLedge checks this

    The agency form capturing design and construction commitments that are checked against the live rulebook.

  • Inspection report

    Construction

    Agency or third-party field observations that sit alongside draws as evidence of progress and conditions.

  • Quarterly construction monitoring report

    Construction

    A periodic status package used by capital partners to track construction progress between major milestones.

  • QAP

    ConceptsGridLedge checks this

    Qualified Allocation Plan — the state allocation framework GridLedge cites when validating document content against program rules.

  • DAS bulletin

    ConceptsGridLedge checks this

    Dated agency guidance that can change how a requirement resolves. Bulletin timing is part of the citation.

  • Eligible basis

    Concepts

    The cost basis used in LIHTC credit calculations. Construction-period documents often move numbers that later feed this figure.

  • Applicable fraction

    Concepts

    The portion of a building treated as low-income for credit sizing — a concept the construction trail must not contradict later.

  • Cost certification

    Cost CertificationGridLedge checks this

    The formal reconciliation of project costs used to support credit delivery, typically after substantial completion.

  • Owner/contractor reconciliation

    Cost CertificationGridLedge checks this

    Workbooks that align owner and contractor cost views before certification — a frequent source of late divergence.

  • Lien waiver

    Cost Certification

    Evidence that payment claims have been released for work covered by a draw or final payment package.

  • Placed in service (PIS)

    8609

    The point at which a building is treated as placed in service for LIHTC purposes, unlocking the 8609 path.

  • 8609 package

    8609GridLedge checks this

    The IRS Form 8609 allocation and related supporting package that closes the construction-period evidence trail.